Skip to main content
A/KAI Kills What?

Task // O*NET task

Low exposure · 1 occupations · 0 evidence

Develop or update project plans for information technology projects including information such as project objectives, t…

Develop or update project plans for information technology projects including information such as project objectives, technologies, systems, information specifications, schedules, funding, and staffing.

Task automation exposure

35/100

Low exposure

Exposure basis

[v4/median] score 35 (raw 35 | A 75 / B 35 / C 35 | modality: other) AI tools can rapidly draft comprehensive project plans, generate Gantt charts, and structure objectives and schedules based on inputs, but they lack the organizational context, stakeholder negotiation, and risk intuition required for professional-grade finalization. (capable: LLM-based project management assistants (e.g., Microsoft Copilot, Asana AI, Jira AI))

0 capabilities · 1 occupations

Basis

How exposure was assessed

[v4/median] score 35 (raw 35 | A 75 / B 35 / C 35 | modality: other) AI tools can rapidly draft comprehensive project plans, generate Gantt charts, and structure objectives and schedules based on inputs, but they lack the organizational context, stakeholder negotiation, and risk intuition required for professional-grade finalization. (capable: LLM-based project management assistants (e.g., Microsoft Copilot, Asana AI, Jira AI))

Automation exposure35/100

How much of this task's output current AI can produce or substantially assist.

Strongest applicable capability0/100

Best current model strength on any capability this task requires.

This is an assessment of technical feasibility plus published evidence - not a forecast. Even fully automatable tasks are often not automated, because of cost, verification, liability, regulation or the fact that the task is bundled with other work.

Occupations

Occupations that perform this task (1)

Importance is the O*NET-style weight of this task within each occupation. The same task can be highly exposed but peripheral to one job and core to another.

Occupations performing Develop or update project plans for information technology projects including information such as project objectives, t…, with task importance and exposure.
OccupationIndustryImportanceRoleOccupation AI exposure
Information Technology Project ManagersCross-industry4.1/5core10

Evidence

Evidence (0)

No evidence item is mapped to this specific task yet. The exposure figure above rests on the v1 editorial baseline and on the capability assessment, and should be treated as low-confidence. Pages with fewer than 0 evidence items are excluded from sitemaps.